FM 1413-2020 Hsip (Stfo, Milled E/L RS)
Liberty County · est $6.9M
Liberty County · est $6.9M
3 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | DURWOOD GREENE CONSTRUCTION CO. | $5,657,771.28 | — |
| 2 | TEXAS MATERIALS GROUP, INC. | $5,663,446.83 | $5,675.55 |
| 3 | HAYDEN PAVING, INC. | $6,800,527.54 | $1,142,756.26 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Bid tab · TxDOT
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7030 SP MIXES SP-C SAC-A PG76-22 | 10,548 TON | $144 | $1.52M | 27% |
| 341-7064 D-GR HMA TY-D PG 64-22 (EXEMPT) | 6,718 TON | $124 | $833k | 15% |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 973 CY | $700 | $681k | 12% |
| 540-7001 MTL W-BEAM GD FEN (TIM POST) | 22,175 LF | $28 | $621k | 11% |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 7,380 SY | $80 | $590k | 10% |
| 316-7245 AGGR (TY-PB OR PL, GR-4)(SAC-B) | 738 CY | $220 | $162k | 3% |
| 500-7001 MOBILIZATION | 1 LS | $142,000 | $142k | 3% |
| 316-7067 ASPH (AC-20-5TR OR AC-20XP) | 34,518 GAL | $3.3 | $114k | 2% |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 23 EA | $3,750 | $86k | 2% |
| 134-7004 BACKFILL (TY A OR B) | 289 STA | $250 | $72k | 1% |