Rer | SH171 | SH22 | FM 308
Hill County · est $9.3M
Hill County · est $9.3M
5 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | BIG CREEK CONSTRUCTION, LTD. | $8,760,907.35 | — |
| 2 | TEXAS MATERIALS GROUP, INC. | $9,849,158.21 | $1,088,250.86 |
| 3 | KNIFE RIVER CORPORATION - SOUTH | $9,933,550.22 | $1,172,642.87 |
| 4 | CK NEWBERRY, LLC | $10,892,840.05 | $2,131,932.70 |
| 5 | FNH CONSTRUCTION, LLC | $15,747,494.70 | $6,986,587.35 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7001 SP MIXES SP-B PG64-22 | 39,912 TON | $90 | $3.59M | 41% |
| 344-7020 SP MIXES SP-C SAC-A PG70-22 | 31,927 TON | $100 | $3.19M | 36% |
| 354-7081 PLANE ASPH CONC PAV (2" TO 4 1/2") | 295,261 SY | $2.35 | $694k | 8% |
| 344-7077 TACK COAT | 58,924 GAL | $3.5 | $206k | 2% |
| 500-7001 MOBILIZATION | 1 LS | $200,000 | $200k | 2% |
| 530-7002 INTERSECTIONS (ACP) | 5,015 SY | $30 | $150k | 2% |
| 666-7293 TY I HIGH PERF PM (W)6"(SLD)(100MIL) | 131,860 LF | $0.8 | $105k | 1% |
| 134-7002 BACKFILL (TY B) | 376 STA | $250 | $94k | 1% |
| 505-7001 TMA (STATIONARY) | 180 DAY | $370 | $67k | 1% |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 76.3 CY | $700 | $53k | 1% |