BMT_IH0010_2(2021 Hsip)Safety Lighting
Jefferson County · est $1.4M
Jefferson County · est $1.4M
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | SICE, INC. | $1,596,374.37 | — |
| 2 | TRAF-TEX, INC. | $1,690,188.60 | $93,814.23 |
| 3 | THIRD COAST SERVICES LLC | $1,747,590.61 | $151,216.24 |
| 4 | SELECT MAINTENANCE, L.L.C. | $1,865,615.50 | $269,241.13 |
| 5 | FLORIDA TRAFFIC CONTROL DEVICES, INC. | $1,969,700.00 | $373,325.63 |
| 6 | APEX ALLIANCE, LLC | $2,110,563.36 | $514,188.99 |
| 7 | GREY SKY CONSTRUCTION LLC | $2,323,770.00 | $727,395.63 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 613-7006 HI MST IL POLE (150 FT)(100 MPH) | 9 EA | $58,109 | $523k | 33% |
| 614-7002 LED HI MST IL ASM (6 FIXT) (TY A) | 9 EA | $36,211 | $326k | 20% |
| 416-7037 DRILL SHAFT (HIGH MAST POLE) (60 IN) | 360 LF | $803.85 | $289k | 18% |
| 500-7001 MOBILIZATION | 1 LS | $84,547 | $85k | 5% |
| 618-7030 CONDT (PVC) (SCH 40) (2") | 4,955 LF | $12.6 | $62k | 4% |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 125 CY | $416.64 | $52k | 3% |
| 432-7001 RIPRAP (CONC)(4 IN) | 36 CY | $1,370 | $49k | 3% |
| 540-7001 MTL W-BEAM GD FEN (TIM POST) | 1,350 LF | $30.25 | $41k | 3% |
| 624-7002 GROUND BOX TY A (122311)W/APRON | 22 EA | $1,432 | $32k | 2% |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 9 EA | $3,422 | $31k |
| 2% |