BMT_FM2830_1(2021 Hsip)Increase Superele
Liberty County · est $573k
Liberty County · est $573k
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | $484,908.43 | — |
| 2 | TEXAS MATERIALS GROUP, INC. | $529,904.70 | $44,996.27 |
| 3 | VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC | $545,508.81 | $60,600.38 |
| 4 | FORDE CONSTRUCTION COMPANY, INC. | $623,427.40 | $138,518.97 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 341-7064 D-GR HMA TY-D PG 64-22 (EXEMPT) | 1,051 TON | $144 | $151k | 31% |
| 247-7067 FL BS (CMP IN PLC)(TY A GR 1-2) (8") | 2,348 SY | $37.69 | $88k | 18% |
| 500-7001 MOBILIZATION | 1 LS | $48,000 | $48k | 10% |
| 467-7328 SET (TY II) (24 IN) (RCP) (6: 1) (P) | 12 EA | $3,000 | $36k | 7% |
| 112-7001 SUBGR WIDEN (OC) | 26.42 STA | $1,230 | $32k | 7% |
| 316-7245 AGGR (TY-PB OR PL, GR-4)(SAC-B) | 64 CY | $298 | $19k | 4% |
| 316-7067 ASPH (AC-20-5TR OR AC-20XP) | 2,959 GAL | $4.55 | $13k | 3% |
| 134-7004 BACKFILL (TY A OR B) | 26.42 STA | $473 | $12k | 3% |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 71 SY | $170 | $12k | 2% |
| 530-7002 INTERSECTIONS (ACP) | 128 SY | $75 | $10k |
| 2% |