US385-1
Ector County · est $5.9M
Ector County · est $5.9M
5 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | SCOUT 5 CONSTRUCTION LLC | $6,185,733.27 | — |
| 2 | RAGLE CONSTRUCTION, INC. | $8,383,422.95 | $2,197,689.68 |
| 3 | GREY SKY CONSTRUCTION LLC | $8,686,111.45 | $2,500,378.18 |
| 4 | REECE ALBERT, INC. | $9,523,850.60 | $3,338,117.33 |
| 5 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | $11,668,843.58 | $5,483,110.31 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 247-7092 FL BS (CMP IN PLC)(TY A GR 4) (10") | 56,310 SY | $15.5 | $873k | 14% |
| 344-7019 SP MIXES SP-C PG70-22 | 6,196 TON | $137.5 | $852k | 14% |
| 347-7001 TOM-C PG76-22 SAC-A | 3,097 TON | $180.5 | $559k | 9% |
| 500-7001 MOBILIZATION | 1 LS | $545,000 | $545k | 9% |
| 610-7213 IN RD IL (TY AL) 50T-8-8 (400W EQ) LED | 31 EA | $8,809 | $273k | 4% |
| 666-7270 RE PROFILE PM TY I(Y)6"(SLD)(100MIL) | 117,459 LF | $2 | $235k | 4% |
| 666-7266 RE PROFILE PM TY I(W)6"(SLD)(100MIL) | 116,788 LF | $2 | $234k | 4% |
| 618-7054 CONDT (PVC) (SCH 80) (2") | 7,560 LF | $26.5 | $200k | 3% |
| 543-7002 CABLE BARRIER SYSTEM (INSTALL)(TL-4) | 9,057 LF | $14 | $127k | 2% |
| 416-7040 DRILL SHAFT (RDWY ILL POLE) (30 IN) | 350 LF |
| $355.5 |
| $124k |
| 2% |