SH 75 at FM 2296 - FY 25
Walker County · est $2.6M
Walker County · est $2.6M
5 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | BIG CREEK CONSTRUCTION, LTD. | $2,980,128.53 | — |
| 2 | LARRY YOUNG PAVING, INC. | $3,123,380.25 | $143,251.72 |
| 3 | KNIFE RIVER CORPORATION - SOUTH | $3,343,417.74 | $363,289.21 |
| 4 | TEXAS MATERIALS GROUP, INC. | $3,481,775.52 | $501,646.99 |
| 5 | A. L. HELMCAMP, INC. | $3,711,878.32 | $731,749.79 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 423-7015 RETAINING WALL (SPREAD FOOTING) | 3,675 SF | $135 | $496k | 17% |
| 344-7020 SP MIXES SP-C SAC-A PG70-22 | 2,767 TON | $135 | $374k | 13% |
| 500-7001 MOBILIZATION | 1 LS | $240,000 | $240k | 8% |
| 432-7001 RIPRAP (CONC)(4 IN) | 313 CY | $685 | $214k | 7% |
| 344-7001 SP MIXES SP-B PG64-22 | 1,532 TON | $115 | $176k | 6% |
| 403-7001 TEMPORARY SPL SHORING | 4,002 SF | $40 | $160k | 5% |
| 247-7044 FL BS (CMP IN PLC)(TY A GR 1-2) (6") | 7,715 SY | $20 | $154k | 5% |
| 610-7124 IN RD IL (TY SA) 40T-8 (250W EQ) LED | 20 EA | $5,700 | $114k | 4% |
| 100-7002 PREPARING ROW | 48 STA | $1,500 | $72k | 2% |
| 110-7001 EXCAV (ROADWAY) | 4,374 CY | $16 | $70k | 2% |