US 259, BU 259-FM850,Hsip 2025
Rusk County · est $2.8M
Rusk County · est $2.8M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | TRUE ROADS CONSTRUCTION LLC | $2,495,223.84 | — |
| 2 | REYNOLDS & KAY, LTD. | $2,696,692.46 | $201,468.62 |
| 3 | L. S. EQUIPMENT CO., INC. | $2,996,013.18 | $500,789.34 |
| 4 | GREY SKY CONSTRUCTION LLC | $3,409,967.00 | $914,743.16 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7001 SP MIXES SP-B PG64-22 | 5,903 TON | $172 | $1.02M | 41% |
| 344-7020 SP MIXES SP-C SAC-A PG70-22 | 1,968 TON | $172 | $338k | 14% |
| 500-7001 MOBILIZATION | 1 LS | $230,000 | $230k | 9% |
| 275-7003 CEMENT TRT (EXIST MATL)(8") | 19,144 SY | $6.25 | $120k | 5% |
| 275-7001 CEMENT | 345 TON | $300 | $104k | 4% |
| 160-7002 FURN & PLACE TOPSOIL (4") | 22,806 SY | $4 | $91k | 4% |
| 316-7258 AGGR (TY-PD OR PL, GR-4) | 149 CY | $300 | $45k | 2% |
| 105-7002 RMV (2"-6") TRT/UNTRT BASE & ASPH PAV | 2,593 SY | $16 | $41k | 2% |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $18,000 | $36k | 1% |
| 316-7068 ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR) | 6,439 GAL | $5.5 | $35k | 1% |