CRP_FM0024_1_1_Nueces_Hsip
Nueces County · est $878k
Nueces County · est $878k
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | SALINAS CONSTRUCTION TECHNOLOGIES, LTD. | $846,575.84 | — |
| 2 | BAY LTD. | $895,502.05 | $48,926.21 |
| 3 | LCR TOTAL TRANSPORT LLC | $939,071.00 | $92,495.16 |
| 4 | J E CONSTRUCTION SERVICES, LLC | $959,554.00 | $112,978.16 |
| 5 | ANDERSON COLUMBIA CO., INC. | $982,402.00 | $135,826.16 |
| 6 | CK NEWBERRY, LLC | $998,389.85 | $151,814.01 |
| 7 | J. CARROLL WEAVER, INC. | $1,076,292.80 | $229,716.96 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $143,750 | $144k | 17% |
| 247-7348 FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS | 1,181 CY | $107.9 | $127k | 15% |
| 341-7050 D-GR HMA TY-D SAC-B PG70-22 | 737 TON | $116.51 | $86k | 10% |
| 341-7002 D-GR HMA TY-B SAC-B PG64-22 | 468 TON | $145.17 | $68k | 8% |
| 351-7002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(3") | 468 SY | $90.7 | $42k | 5% |
| 110-7001 EXCAV (ROADWAY) | 1,703 CY | $22.19 | $38k | 4% |
| 260-7001 LIME (COM OR QK)(SLURRY) OR QK(DRY) | 90 TON | $379.66 | $34k | 4% |
| 105-7016 RMV (16"-20") TRT/UNTRT BASE & ASPH PAV | 1,134 SY | $21.62 | $25k | 3% |
| 161-7002 COMPOST MANUF TOPSOIL (4") | 5,724 SY | $3.96 | $23k | 3% |
| 260-7007 LIME TRT (EXIST MATL)(8") | 4,534 SY | $4.77 |
| $22k |
| 3% |