CRP_FM0624_2_1_Jimwells_Hsip
Jim Wells County · est $2.2M
Jim Wells County · est $2.2M
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | HUNTER INDUSTRIES, LTD. | $1,711,943.10 | — |
| 2 | ANDERSON COLUMBIA CO., INC. | $1,984,982.05 | $273,038.95 |
| 3 | J E CONSTRUCTION SERVICES, LLC | $2,148,590.00 | $436,646.90 |
| 4 | LCR TOTAL TRANSPORT LLC | $2,229,295.40 | $517,352.30 |
| 5 | CK NEWBERRY, LLC | $2,237,604.55 | $525,661.45 |
| 6 | RBM CONTRACTORS LLC | $2,895,219.41 | $1,183,276.31 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 341-7050 D-GR HMA TY-D SAC-B PG70-22 | 4,091 TON | $111.1 | $455k | 27% |
| 500-7001 MOBILIZATION | 1 LS | $152,999 | $153k | 9% |
| 247-7348 FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS | 1,237 CY | $104.32 | $129k | 8% |
| 685-7004 INSTL RDSD FLSH BCN ASSM (SOLAR PWRD) | 16 EA | $7,150 | $114k | 7% |
| 316-7212 AGGR (TY-PB, GR-4S OR 4)(SAC-B) | 345 CY | $185.69 | $64k | 4% |
| 316-7070 ASPH(AC-15P, HFRS-2P OR CRS-2P) | 11,889 GAL | $4.29 | $51k | 3% |
| 132-7006 EMBANK (FNL)(DC)(TY C) | 2,389 CY | $19.8 | $47k | 3% |
| 610-7124 IN RD IL (TY SA) 40T-8 (250W EQ) LED | 10 EA | $4,500 | $45k | 3% |
| 530-7006 DRIVEWAYS (CONC) | 348 SY | $124.23 | $43k | 3% |
| 530-7002 INTERSECTIONS (ACP) | 2,694 SY | $15.4 | $41k |
| 2% |