Brownwood Area Thermo Striping FY 2026
Brown County · est $2.3M
Brown County · est $2.3M
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | D. I. J. CONSTRUCTION, INC. | $1,851,158.82 | — |
| 2 | STRIPE-A-ZONE, LLC | $1,857,380.54 | $6,221.72 |
| 3 | L&L COMPANY | $1,877,651.92 | $26,493.10 |
| 4 | CENTERLINE TECHNOLOGIES, LLC | $2,189,163.93 | $338,005.11 |
| 5 | TRP INFRASTRUCTURE SERVICES, LLC | $2,218,312.06 | $367,153.24 |
| 6 | GREY SKY CONSTRUCTION LLC | $2,367,336.87 | $516,178.05 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 666-7423 REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 1,554,577 LF | $0.38 | $591k | 32% |
| 666-7411 REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 1,497,955 LF | $0.38 | $569k | 31% |
| 533-7002 MILL RUMBLE STRIPS (ASPH) (CENTERLINE) | 979,952 LF | $0.16 | $157k | 8% |
| 533-7001 MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 1,010,084 LF | $0.13 | $131k | 7% |
| 672-7004 REFL PAV MRKR TY II-A-A | 32,579 EA | $4 | $130k | 7% |
| 666-7420 REFL PAV MRK TY I (Y)6"(BRK)(100MIL) | 151,801 LF | $0.39 | $59k | 3% |
| 668-7089 PREFAB PM TY C (W)(24")(SLD) | 3,341 LF | $11.35 | $38k | 2% |
| 668-7100 PREFAB PM TY C (W)(LN REDUCT ARROW) | 42 EA | $700 | $29k | 2% |
| 668-7127 PREFAB PM TY C (Y)(24")(SLD) | 2,679 LF | $9.5 | $25k | 1% |
| 666-7408 |
| 58,562 LF |
| $0.39 |
| $23k |
| 1% |