FM 943-(S/Polk C/L-FM1003)Base Repair,OV
Hardin County · est $5.9M
Hardin County · est $5.9M
3 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | DURWOOD GREENE CONSTRUCTION CO. | $6,974,719.38 | — |
| 2 | TEXAS MATERIALS GROUP, INC. | $7,235,078.45 | $260,359.07 |
| 3 | HAYDEN PAVING, INC. | $8,177,811.90 | $1,203,092.52 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Bid tab · TxDOT
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 346-7009 STONE-MTRX-ASPH SMA-D SAC-A PG76-22 | 14,513 TON | $220 | $3.19M | 46% |
| 341-7048 D-GR HMA TY-D PG70-22 | 10,884 TON | $140 | $1.52M | 22% |
| 500-7001 MOBILIZATION | 1 LS | $460,000 | $460k | 7% |
| 134-7004 BACKFILL (TY A OR B) | 438.72 STA | $350 | $154k | 2% |
| 100-7002 PREPARING ROW | 159.82 STA | $825 | $132k | 2% |
| 666-7266 RE PROFILE PM TY I(W)6"(SLD)(100MIL) | 87,196 LF | $1.05 | $92k | 1% |
| 400-7010 CEM STABIL BKFL | 1,071 CY | $80 | $86k | 1% |
| 530-7018 TURNOUTS (ACP) | 805 SY | $100 | $81k | 1% |
| 496-7007 REMOV STR (PIPE) | 910 LF | $80 | $73k | 1% |
| 467-7470 SET (TY II) (48 IN) (TP) (4:1) (C) | 12 EA | $6,000 | $72k | 1% |