FY 2026 Bridge Maint (Districtwide)
El Paso County · est $769k
El Paso County · est $769k
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | RAGLE CONSTRUCTION, INC. | $812,409.50 | — |
| 2 | PREMIER CONTRACTORS LLC | $1,020,230.00 | $207,820.50 |
| 3 | HAWK CONSTRUCTION | $1,075,145.90 | $262,736.40 |
| 4 | INTERNATIONAL EAGLE ENTERPRISES, INC. | $1,133,660.50 | $321,251.00 |
| 5 | GIBSON & ASSOCIATES, INC. | $1,143,917.44 | $331,507.94 |
| 6 | THE TRUESDELL CORPORATION | $1,268,268.00 | $455,858.50 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 439-7021 POLYESTER POLYMER CONC OVERLAY (1") | 1,172 SY | $150 | $176k | 22% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $52,750 | $158k | 19% |
| 480-7001 CLEAN EXIST CULVERTS | 1 EA | $119,000 | $119k | 15% |
| 500-7001 MOBILIZATION | 1 LS | $80,000 | $80k | 10% |
| 785-7011 BRIDGE JOINT REPLACEMENT (SEJ) | 223 LF | $320 | $71k | 9% |
| 439-7016 POLYESTER POLYMER CONC OVERLAY (1-1/2") | 308 SY | $200 | $62k | 8% |
| 505-7001 TMA (STATIONARY) | 78 DAY | $350 | $27k | 3% |
| 786-7002 CARBON FIBER REINF POLYMER STRENGTHNING | 252.5 SF | $75 | $19k | 2% |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 717 LF | $23 | $16k | 2% |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 106 SF |
| $150 |
| $16k |
| 2% |