FM 2933 at FM 545 to CR 335
Collin County · est $12M
Collin County · est $12M
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | A. K. GILLIS & SONS, LLC | $11,064,754.04 | — |
| 2 | D. L. LENNON INCORPORATED - CONTRACTOR | $11,837,268.80 | $772,514.76 |
| 3 | JAGOE-PUBLIC COMPANY | $11,981,310.07 | $916,556.03 |
| 4 | H. V. CAVER, INC. | $12,685,373.89 | $1,620,619.85 |
| 5 | ED BELL CONSTRUCTION COMPANY | $12,987,440.20 | $1,922,686.16 |
| 6 | OVERLAND CORPORATION | $14,130,847.37 | $3,066,093.33 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 247-7340 FL BS (CMP IN PLC)(TY D GR-1-2)(9") | 101,204 SY | $22.71 | $2.30M | 21% |
| 344-7011 SP MIXES SP-C SAC-B PG64-22 | 17,512 TON | $122.51 | $2.15M | 19% |
| 530-7010 DRIVEWAYS (ACP) | 12,024 SY | $62 | $745k | 7% |
| 500-7001 MOBILIZATION | 1 LS | $665,982 | $666k | 6% |
| 247-7209 FL BS (RDWY DEL) (TY D GR 1-2) | 9,335 TON | $50.91 | $475k | 4% |
| 275-7006 CEMENT TRT (EXIST MATL & NEW BASE)(6") | 98,706 SY | $2.75 | $271k | 2% |
| 432-7041 RIPRAP (STONE PROTECTION)(12 IN) | 741 CY | $324.18 | $240k | 2% |
| 110-7001 EXCAV (ROADWAY) | 13,236 CY | $17.5 | $232k | 2% |
| 132-7006 EMBANK (FNL)(DC)(TY C) | 11,563 CY | $17.5 | $202k | 2% |
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 604 CY | $324.18 | $196k |
| 2% |