FY25 BPM FM 306 at Suche and Potter CRK
Comal County · est $191k
Comal County · est $191k
13 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | BK FIELD OPERATIONS LLC | $135,300.00 | — |
| 2 | USA DT SERVICES, INC. | $182,109.66 | $46,809.66 |
| 3 | DIAMOND R CONTRACTING, LLC | $190,223.00 | $54,923.00 |
| 4 | AAD CONTRACTING INC. | $193,158.50 | $57,858.50 |
| 5 | BECK-REIT & SONS, LTD. | $196,259.00 | $60,959.00 |
| 6 | DELGADO'S CONTRACTORS, LLC | $198,084.00 | $62,784.00 |
| 7 | TEXAS ROAD CONSTRUCTION, LLC | $209,402.00 | $74,102.00 |
| 8 | LAKEY, INC. | $226,613.25 | $91,313.25 |
| 9 | ICOS MANAGEMENT, LLC | $228,555.00 | $93,255.00 |
| 10 | RHINO EQUITY, LLC | $232,778.00 | $97,478.00 |
| 11 | CRACKSEAL OF TEXAS, LLC | $233,750.00 | $98,450.00 |
| 12 | TAYLOR CONTRACTING LLC | $230,177.00 | $94,877.00 |
| 13 | STRUCTURAL INTEGRITY GROUP LLC | $285,687.00 | $150,387.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 432-7002 RIPRAP (CONC)(5 IN) | 120 CY | $515 | $62k | 46% |
| 500-7001 MOBILIZATION | 1 LS | $25,000 | $25k | 18% |
| 459-7007 GABION MATTRESSES (GALV)(12 IN) | 118 SY | $100 | $12k | 9% |
| 752-7003 TREE TRIMMING / BRUSH REMOVAL(CHANNELS) | 0.3 AC | $35,000 | $11k | 8% |
| 459-7014 GABION (1.5' X 3')(GALV) | 33 CY | $230 | $8k | 6% |
| 161-7002 COMPOST MANUF TOPSOIL (4") | 500 SY | $10 | $5k | 4% |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 7 CY | $475 | $3k | 2% |
| 432-7029 RIPRAP (STONE COMMON)(DRY)(6 IN) | 89 CY | $30 | $3k | 2% |
| 401-7001 FLOWABLE BACKFILL | 35 CY | $50 | $2k | 1% |
| 506-7044 BIODEG EROSN CONT LOGS (INSTL) (12") | 325 LF | $4 | $1k | 1% |