CR 230 Bridge Replacement HBP
Karnes County · est $1.1M
Karnes County · est $1.1M
10 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | C & W SOUTHERN LLC | $817,324.60 | — |
| 2 | PRESIDIO CONTRACTING, LLC | $862,084.00 | $44,759.40 |
| 3 | E-Z BEL CONSTRUCTION, LLC | $879,775.00 | $62,450.40 |
| 4 | CK NEWBERRY, LLC | $919,223.00 | $101,898.40 |
| 5 | ACME BRIDGE COMPANY, INC. | $934,780.13 | $117,455.53 |
| 6 | DELGADO'S CONTRACTORS, LLC | $975,500.00 | $158,175.40 |
| 7 | TREVWAY, INC. | $984,379.00 | $167,054.40 |
| 8 | STX CIVIL | $995,516.29 | $178,191.69 |
| 9 | GARRET SHIELDS INFRASTRUCTURE | $1,033,607.00 | $216,282.40 |
| 10 | J. CARROLL WEAVER, INC. | $1,037,492.58 | $220,167.98 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 893 CY | $185 | $165k | 20% |
| 500-7001 MOBILIZATION | 1 LS | $90,000 | $90k | 11% |
| 425-7001 PRESTR CONC GIRDER (TX28) | 277.93 LF | $320 | $89k | 11% |
| 422-7001 REINF CONC SLAB | 2,100 SF | $30 | $63k | 8% |
| 416-7006 DRILL SHAFT (36 IN) | 240 LF | $235 | $56k | 7% |
| 420-7012 CL C CONC (ABUT) | 48.8 CY | $1,100 | $54k | 7% |
| 247-7348 FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS | 397 CY | $115 | $46k | 6% |
| 422-7013 APPROACH SLAB | 53.4 CY | $850 | $45k | 6% |
| 450-7008 RAIL (TY T223) | 216 LF | $150 | $32k | 4% |
| 400-7010 CEM STABIL BKFL | 75 CY | $300 | $23k | 3% |