2020 GCAA City of Harlingen
Cameron County · est $224k
Cameron County · est $224k
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | LUCANIA CONTRACTORS LLC | $240,951.94 | — |
| 2 | TEXAS ROAD CONSTRUCTION, LLC | $260,304.00 | $19,352.06 |
| 3 | TIGHT LINE CONSTRUCTION, LLC | $272,291.00 | $31,339.06 |
| 4 | GV LANDSCAPE AND CONSTRUCTION LLC | $282,688.00 | $41,736.06 |
| 5 | CASTILLO ARANDA LLC | $338,028.00 | $97,076.06 |
| 6 | CENTRAL NORTH CONSTRUCTION, LLC | $898,615.00 | $657,663.06 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 192-7016 LANDSCAPE EDGE | 1,140 LF | $39.01 | $44k | 18% |
| 192-7003 PLANT SOIL MIX | 137 CY | $287.73 | $39k | 16% |
| 192-7026 PLANT MATERIAL (1 GAL) | 383 EA | $90.72 | $35k | 14% |
| 192-7009 PLANT BED PREP | 973 SY | $31.36 | $31k | 13% |
| 170-7001 IRRIGATION SYSTEM | 1 LS | $18,900 | $19k | 8% |
| 193-7007 IRRIG SYS OPER AND MAINT | 9 MO | $1,638 | $15k | 6% |
| 192-7029 PLANT MATERIAL (5 GAL) | 173 EA | $65.52 | $11k | 5% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 MO | $2,077 | $10k | 4% |
| 193-7001 LANDSCAPE ESTABLISH | 9 MO | $1,134 | $10k | 4% |
| 110-7003 EXCAV (SPECIAL) | 57 CY | $140.17 | $8k | 3% |