BMT_FM0365_1 (2022 Hsip) Paved Shoulders
Jefferson County · est $1.3M
Jefferson County · est $1.3M
3 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | $1,134,405.95 | — |
| 2 | TEXAS MATERIALS GROUP, INC. | $1,317,467.90 | $183,061.95 |
| 3 | MB WESTERN INDUSTRIAL CONTRACTING CO. | $1,958,236.00 | $823,830.05 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Bid tab · TxDOT
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 341-7003 D-GR HMA TY-B PG64-22 (EXEMPT) | 2,860 TON | $120 | $343k | 30% |
| 530-7006 DRIVEWAYS (CONC) | 596 SY | $200 | $119k | 11% |
| 530-7015 DRIVEWAYS (BASE) | 1,653 SY | $45.5 | $75k | 7% |
| 467-7308 SET (TY II) (18 IN) (RCP) (6: 1) (P) | 69 EA | $1,050 | $72k | 6% |
| 500-7001 MOBILIZATION | 1 LS | $60,000 | $60k | 5% |
| 466-7107 HEADWALL (CH - PW - 0) (DIA= 48 IN) | 4 EA | $14,250 | $57k | 5% |
| 112-7001 SUBGR WIDEN (OC) | 58 STA | $850 | $49k | 4% |
| 467-7392 SET (TY II) (48 IN) (RCP) (6: 1) (P) | 3 EA | $14,000 | $42k | 4% |
| 530-7010 DRIVEWAYS (ACP) | 681 SY | $53.75 | $37k | 3% |
| 464-7011 RC PIPE (CL III)(48 IN) | 82 LF | $380 | $31k | 3% |