SH 16 Fr. Mills CL to .4 Mi S CR 140
San Saba County · est $14M
San Saba County · est $14M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | ALLEN KELLER COMPANY | $11,074,628.98 | — |
| 2 | CK NEWBERRY, LLC | $11,885,996.63 | $811,367.65 |
| 3 | BIG CREEK CONSTRUCTION, LTD. | $12,387,672.30 | $1,313,043.32 |
| 4 | TEXAS MATERIALS GROUP, INC. | $13,973,451.50 | $2,898,822.52 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 247-7090 FL BS (CMP IN PLC)(TY A GR 1-2) (10") | 120,269 SY | $17.44 | $2.10M | 19% |
| 500-7001 MOBILIZATION | 1 LS | $1,052,000 | $1.05M | 9% |
| 341-7001 D-GR HMA TY-B PG64-22 | 6,524 TON | $107.7 | $703k | 6% |
| 508-7001 CONSTRUCTING DETOURS | 28,057 SY | $23.21 | $651k | 6% |
| 247-7176 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | 11,151 CY | $43.47 | $485k | 4% |
| 403-7001 TEMPORARY SPL SHORING | 8,335 SF | $38.3 | $319k | 3% |
| 316-7086 ASPH (AC-20-5TR OR CRS-2P) | 66,453 GAL | $4.68 | $311k | 3% |
| 432-7002 RIPRAP (CONC)(5 IN) | 461 CY | $645.74 | $298k | 3% |
| 460-7005 CMP (GAL STL 24 IN) | 1,969 LF | $147.33 | $290k | 3% |
| 467-7324 SET (TY II) (24 IN) (CMP) (6: 1) (P) | 70 EA | $3,605 | $252k |
| 2% |