US 287 Safety Lighting 1/1
Armstrong County · est $8.3M
Armstrong County · est $8.3M
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | HJC FARMS, INC. | $6,922,965.90 | — |
| 2 | GILVIN-TERRILL, LTD. | $7,485,976.70 | $563,010.80 |
| 3 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC | $7,883,063.24 | $960,097.34 |
| 4 | GRATIOT CONSTRUCTION, LTD. | $8,234,415.50 | $1,311,449.60 |
| 5 | TI-ZACK CONCRETE, LLC | $9,301,859.35 | $2,378,893.45 |
| 6 | ROADWAY SPECIALTIES, INC. | $9,923,821.72 | $3,000,855.82 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 4,546 CY | $457 | $2.08M | 30% |
| 543-7002 CABLE BARRIER SYSTEM (INSTALL)(TL-4) | 57,253 LF | $12.5 | $716k | 10% |
| 344-7057 SP MIXES SP-D SAC-A PG70-28 | 3,066 TON | $200 | $613k | 9% |
| 247-7133 FL BS (CMP IN PLC)(TY A OR B GR 4)(12") | 8,906 SY | $48 | $427k | 6% |
| 500-7001 MOBILIZATION | 1 LS | $400,000 | $400k | 6% |
| 132-7004 EMBANK (FNL)(DC)(TY B) | 18,510 CY | $19.75 | $366k | 5% |
| 314-7011 EMULS ASPH (EROSN CONT)(CSS-1H) | 55,660 GAL | $5.15 | $287k | 4% |
| 610-7233 IN RD IL (TY ST) 50T-12-12(400W EQ)LED | 36 EA | $7,550 | $272k | 4% |
| 514-7001 PERM CTB (SGL SLOPE) (TY 1) (42 ) | 2,272 LF | $100 | $227k | 3% |
| 618-7054 CONDT (PVC) (SCH 80) (2") | 10,089 LF |
| $19 |
| $192k |
| 3% |