0069-07-113 US 87 Intersection Improve
Tom Green County · est $1.8M
Tom Green County · est $1.8M
2 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | REECE ALBERT, INC. | $2,825,728.44 | — |
| 2 | RK HALL, LLC | $2,999,977.12 | $174,248.68 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Bid tab · TxDOT
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7021 SP MIXES SP-C SAC-B PG70-22 | 4,248 TON | $175.46 | $745k | 26% |
| 351-7012 FLEXIBLE PAVEMENT STRUCTURE REPAIR(13") | 1,193 SY | $244.24 | $291k | 10% |
| 500-7001 MOBILIZATION | 1 LS | $266,678 | $267k | 9% |
| 247-7176 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | 1,391 CY | $121.98 | $170k | 6% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $30,418 | $91k | 3% |
| 160-7002 FURN & PLACE TOPSOIL (4") | 9,598 SY | $9.43 | $91k | 3% |
| 680-7002 INSTALL HWY TRF SIG (ISOLATED) | 1 EA | $76,743 | $77k | 3% |
| 536-7002 CONC MEDIAN | 217 SY | $345.29 | $75k | 3% |
| 354-7083 PLANE ASPH CONC PAV (0" TO 2-1/2") | 7,589 SY | $9.83 | $75k | 3% |
| 110-7001 EXCAV (ROADWAY) | 750 CY | $91.51 | $69k | 2% |