FM 382 Hsip Widening Taylor County
Taylor County · est $2.4M
Taylor County · est $2.4M
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | J. H. STRAIN & SONS, INC. | $1,784,682.40 | — |
| 2 | CK NEWBERRY, LLC | $2,156,894.40 | $372,212.00 |
| 3 | BONTKE BROTHERS CONSTRUCTION COMPANY | $2,512,502.00 | $727,819.60 |
| 4 | LAKEY, INC. | $2,596,954.00 | $812,271.60 |
| 5 | GILVIN-TERRILL, LTD. | $2,844,005.78 | $1,059,323.38 |
| 6 | GREY SKY CONSTRUCTION LLC | $2,848,040.25 | $1,063,357.85 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 247-7176 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | 3,747 CY | $58 | $217k | 12% |
| 316-7007 ASPH (AC-20-5TR) | 23,162 GAL | $8 | $185k | 10% |
| 351-7003 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") | 4,455 SY | $38 | $169k | 9% |
| 500-7001 MOBILIZATION | 1 LS | $125,000 | $125k | 7% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 11 MO | $10,000 | $110k | 6% |
| 316-7211 AGGR (TY-PB, GR-4)(SAC-B) | 467 CY | $200 | $93k | 5% |
| 110-7001 EXCAV (ROADWAY) | 6,566 CY | $14 | $92k | 5% |
| 132-7002 EMBANK (FNL)(DC)(TY A) | 5,248 CY | $17 | $89k | 5% |
| 467-7096 SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1)(C) | 8 EA | $8,875 | $71k | 4% |
| 316-7086 ASPH (AC-20-5TR OR CRS-2P) | 8,181 GAL | $8 | $65k |
| 4% |