Sat_IH0035
Comal County · est $15M
Comal County · est $15M
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | J3 COMPANY, LLC | $12,034,296.02 | — |
| 2 | CAPITAL EXCAVATION COMPANY | $13,440,746.72 | $1,406,450.70 |
| 3 | E-Z BEL CONSTRUCTION, LLC | $14,464,110.69 | $2,429,814.67 |
| 4 | STX CIVIL | $14,479,932.80 | $2,445,636.78 |
| 5 | GO UNDERGROUND, LIMITED LIABILITY COMPANY | $14,861,823.70 | $2,827,527.68 |
| 6 | HUNTER INDUSTRIES, LTD. | $14,906,102.66 | $2,871,806.64 |
| 7 | COPASA INC | $15,689,186.16 | $3,654,890.14 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 341-7001 D-GR HMA TY-B PG64-22 | 15,391 TON | $88 | $1.35M | 11% |
| 110-7001 EXCAV (ROADWAY) | 30,577 CY | $32 | $978k | 8% |
| 500-7001 MOBILIZATION | 1 LS | $890,000 | $890k | 7% |
| 508-7001 CONSTRUCTING DETOURS | 5,812 SY | $115 | $668k | 6% |
| 527-7002 COLORED TEXTURED CONC (5") | 8,043 SY | $80 | $643k | 5% |
| 247-7013 FL BS (CMP IN PLC)(TY D GR 1-2) | 14,633 TON | $35 | $512k | 4% |
| 100-7002 PREPARING ROW | 45 STA | $8,000 | $360k | 3% |
| 344-7031 SP MIXES SP-C SAC-B PG76-22 | 3,256 TON | $110 | $358k | 3% |
| 531-7001 CONC SIDEWALKS (4") | 5,435 SY | $50 | $272k | 2% |
| 464-7005 RC PIPE (CL III)(24 IN) | 2,055 LF | $130 | $267k | 2% |