Sat_US0281_3
Atascosa County · est $1.2M
Atascosa County · est $1.2M
10 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | E-Z BEL CONSTRUCTION, LLC | $1,035,227.75 | — |
| 2 | TI-ZACK CONCRETE, LLC | $1,080,670.81 | $45,443.06 |
| 3 | SALINAS CONSTRUCTION TECHNOLOGIES, LTD. | $1,093,186.73 | $57,958.98 |
| 4 | STX CIVIL | $1,098,156.63 | $62,928.88 |
| 5 | D&S CONCRETE CONTRACTORS LLC | $1,186,817.75 | $151,590.00 |
| 6 | ELECNOR BELCO ELECTRIC, INC. | $1,188,684.00 | $153,456.25 |
| 7 | GARRET SHIELDS INFRASTRUCTURE | $1,194,053.40 | $158,825.65 |
| 8 | PRESIDIO CONTRACTING, LLC | $1,265,505.10 | $230,277.35 |
| 9 | DEAN WORD COMPANY, LTD. | $1,270,123.55 | $234,895.80 |
| 10 | ACME BRIDGE COMPANY, INC. | $1,688,982.86 | $653,755.11 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 531-7001 CONC SIDEWALKS (4") | 1,646 SY | $106 | $174k | 17% |
| 530-7006 DRIVEWAYS (CONC) | 1,031 SY | $106 | $109k | 11% |
| 500-7001 MOBILIZATION | 1 LS | $90,000 | $90k | 9% |
| 400-7006 CUT & RESTORING PAV | 819 SY | $89 | $73k | 7% |
| 6008-7001 RVDS (PRESENCE DETECTION ONLY) | 4 EA | $14,000 | $56k | 5% |
| 529-7001 CONC CURB (TY I) | 2,241 LF | $20 | $45k | 4% |
| 505-7001 TMA (STATIONARY) | 75 DAY | $500 | $38k | 4% |
| 531-7011 CURB RAMPS (TY 10) | 10 EA | $3,200 | $32k | 3% |
| 687-7001 PED POLE ASSEMBLY | 10 EA | $2,700 | $27k | 3% |
| 6008-7002 RVDS (ADVANCE DETECTION ONLY) | 2 EA | $13,000 | $26k | 3% |