HOU_FM 2854, Lone Star Elem-McCaleb
Montgomery County · est $668k
Montgomery County · est $668k
8 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | THIRD COAST SERVICES LLC | $636,099.25 | — |
| 2 | CREACOM, INC. | $642,269.97 | $6,170.72 |
| 3 | ALLSTATE SIGNAL & CONSTRUCTION, LLC | $719,645.47 | $83,546.22 |
| 4 | SICE, INC. | $775,901.19 | $139,801.94 |
| 5 | LIGHT IT UP ELECTRIC | $809,328.75 | $173,229.50 |
| 6 | FLORIDA TRAFFIC CONTROL DEVICES, INC. | $875,875.00 | $239,775.75 |
| 7 | TRAF-TEX, INC. | $968,950.75 | $332,851.50 |
| 8 | VACA UNDERGROUND UTILITIES INC | $1,139,845.00 | $503,745.75 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 618-7057 CONDT (PVC) (SCH 80) (2") (CONC ENCSE) | 16,885 LF | $15.91 | $269k | 42% |
| 623-7002 ITS GND BOX(PCAST) TY 1 (243636)W/APRN | 31 EA | $3,979 | $123k | 19% |
| 500-7001 MOBILIZATION | 1 LS | $63,610 | $64k | 10% |
| 618-7055 CONDT (PVC) (SCH 80) (2") (BORE) | 2,945 LF | $14.51 | $43k | 7% |
| 6027-7002 FIBER OPTIC CBL (SINGLE-MODE)(36 FIBER) | 20,320 LF | $1.87 | $38k | 6% |
| 6027-7003 FO SPLICE ENCLOSURE (TYPE 2) | 10 EA | $2,615 | $26k | 4% |
| 620-7002 ELEC CONDR (NO.14) INSULATED | 19,875 LF | $1.25 | $25k | 4% |
| 505-7001 TMA (STATIONARY) | 41 DAY | $397.73 | $16k | 3% |
| 6027-7005 FIBER OPTIC PATCH PANEL (12 POSITION) | 10 EA | $1,505 | $15k | 2% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $1,935 |
| $8k |
| 1% |