BU 82H Hsip
Lamar County · est $1.8M
Lamar County · est $1.8M
9 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | HIGHWAY 19 CONSTRUCTION LLC | $1,345,111.44 | — |
| 2 | SCOUT 5 CONSTRUCTION LLC | $1,487,006.37 | $141,894.93 |
| 3 | GARRET SHIELDS INFRASTRUCTURE | $1,583,420.00 | $238,308.56 |
| 4 | STX CIVIL | $1,614,876.50 | $269,765.06 |
| 5 | THK CONSTRUCTION LLC | $1,649,861.75 | $304,750.31 |
| 6 | GHB EQUIPMENT COMPANY, L.L.C. | $1,695,450.22 | $350,338.78 |
| 7 | RB CONTRACTING, LLC | $1,757,931.00 | $412,819.56 |
| 8 | TI-ZACK CONCRETE, LLC | $1,887,110.10 | $541,998.66 |
| 9 | O. TREVINO CONSTRUCTION, LLC | $2,072,341.91 | $727,230.47 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 531-7002 CONC SIDEWALKS (5") | 6,488 SY | $73.63 | $478k | 36% |
| 500-7001 MOBILIZATION | 1 LS | $170,000 | $170k | 13% |
| 530-7006 DRIVEWAYS (CONC) | 1,264 SY | $110 | $139k | 10% |
| 100-7002 PREPARING ROW | 91.98 STA | $750 | $69k | 5% |
| 531-7010 CURB RAMPS (TY 7) | 42 EA | $1,500 | $63k | 5% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 MO | $5,000 | $50k | 4% |
| 110-7003 EXCAV (SPECIAL) | 1,616 CY | $25 | $40k | 3% |
| 162-7002 BLOCK SODDING | 7,645 SY | $5 | $38k | 3% |
| 104-7011 REMOV CONC (DRIVEWAYS) | 1,269 SY | $25 | $32k | 2% |
| 531-7026 CONCRETE SIDEWALK (RETAINING WALL) | 27 CY | $1,150 | $31k | 2% |