SH 34 at Abner Rd
Kaufman County · est $949k
Kaufman County · est $949k
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | AUSTIN BRIDGE & ROAD SERVICES, LP | $960,752.59 | — |
| 2 | HIGHWAY 19 CONSTRUCTION LLC | $1,077,943.85 | $117,191.26 |
| 3 | TEXAS MATERIALS GROUP, INC. | $1,146,565.92 | $185,813.33 |
| 4 | XIT PAVING AND CONSTRUCTION INC. | $1,197,302.78 | $236,550.19 |
| 5 | QUALITY EXCAVATION, LLC | $1,216,242.93 | $255,490.34 |
| 6 | ED BELL CONSTRUCTION COMPANY | $1,519,774.41 | $559,021.82 |
| 7 | RAGLE CONSTRUCTION, INC. | $1,991,062.82 | $1,030,310.23 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 247-7125 FL BS (CMP IN PLC)(TY D GR 1-2) (12") | 1,954 SY | $65 | $127k | 13% |
| 344-7021 SP MIXES SP-C SAC-B PG70-22 | 710 TON | $150 | $107k | 11% |
| 500-7001 MOBILIZATION | 1 LS | $104,000 | $104k | 11% |
| 344-7001 SP MIXES SP-B PG64-22 | 646 TON | $150 | $97k | 10% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 8 MO | $8,000 | $64k | 7% |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 531 SY | $98 | $52k | 5% |
| 132-7005 EMBANK (FNL)(OC)(TY C) | 1,374.88 CY | $37.75 | $52k | 5% |
| 530-7010 DRIVEWAYS (ACP) | 665 SY | $70 | $47k | 5% |
| 162-7002 BLOCK SODDING | 7,167 SY | $3.9 | $28k | 3% |
| 467-7308 SET (TY II) (18 IN) (RCP) (6: 1) (P) | 15 EA | $1,800 | $27k | 3% |