IH 30 WBFR Ent Ramp to SL 12
Dallas County · est $1.1M
Dallas County · est $1.1M
9 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC | $1,127,949.43 | — |
| 2 | VACA UNDERGROUND UTILITIES INC | $1,184,484.00 | $56,534.57 |
| 3 | SICE, INC. | $1,188,584.10 | $60,634.67 |
| 4 | GARRET SHIELDS INFRASTRUCTURE | $1,228,865.00 | $100,915.57 |
| 5 | WG ENGINEERING & CONSTRUCTION, LLC | $1,302,473.40 | $174,523.97 |
| 6 | YUNEX LLC | $1,397,375.22 | $269,425.79 |
| 7 | GREY SKY CONSTRUCTION LLC | $1,400,301.50 | $272,352.07 |
| 8 | MARCOM'S MOWING SERVICE, LLC | $1,543,781.50 | $415,832.07 |
| 9 | STRUCTURAL INTEGRITY GROUP LLC | $1,627,455.81 | $499,506.38 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 6075-7002 INSTALL SOLAR-POWERED DFSSA | 53 EA | $5,330 | $282k | 25% |
| 685-7004 INSTL RDSD FLSH BCN ASSM (SOLAR PWRD) | 30 EA | $7,225 | $217k | 19% |
| 687-7001 PED POLE ASSEMBLY | 53 EA | $3,449 | $183k | 16% |
| 610-7072 IN RD IL (TY SA) 30T-8 (250W EQ) LED | 15 EA | $4,893 | $73k | 7% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $15,783 | $63k | 6% |
| 628-7044 ELC SRV TY A 240/480 060(NS)SS(E)GC(O) | 5 EA | $11,329 | $57k | 5% |
| 500-7001 MOBILIZATION | 1 LS | $42,411 | $42k | 4% |
| 618-7031 CONDT (PVC) (SCH 40) (2") (BORE) | 735 LF | $50.94 | $37k | 3% |
| 416-7040 DRILL SHAFT (RDWY ILL POLE) (30 IN) | 120 LF | $276.71 | $33k | 3% |
| 644-7001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 33 EA |
| $844.73 |
| $28k |
| 2% |