Ave H Bridge Replacement 2609
Matagorda County · est $3.8M
Matagorda County · est $3.8M
9 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | SCOUT 5 CONSTRUCTION LLC | $3,170,843.64 | — |
| 2 | JOHN REED AND COMPANY, LLC | $3,496,933.70 | $326,090.06 |
| 3 | TREVWAY, INC. | $3,508,812.90 | $337,969.26 |
| 4 | STX CIVIL | $3,652,466.15 | $481,622.51 |
| 5 | E-Z BEL CONSTRUCTION, LLC | $3,732,051.20 | $561,207.56 |
| 6 | C. E. BARKER, LTD. | $3,762,209.49 | $591,365.85 |
| 7 | R CONSTRUCTION CIVIL, LLC | $4,230,872.10 | $1,060,028.46 |
| 8 | TALBERT COMPANIES LLC | $4,422,581.61 | $1,251,737.97 |
| 9 | CK NEWBERRY, LLC | $5,878,554.00 | $2,707,710.36 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 1,895 CY | $300 | $569k | 18% |
| 416-7004 DRILL SHAFT (24 IN) | 2,132 LF | $240 | $512k | 16% |
| 425-7019 PRESTR CONC SLAB BEAM (5SB15) | 1,969.06 LF | $240 | $473k | 15% |
| 422-7007 REINF CONC SLAB (SLAB BEAM) | 10,273 SF | $28.02 | $288k | 9% |
| 422-7012 BRIDGE SIDEWALK | 2,997 SF | $47.9 | $144k | 5% |
| 360-7017 CONC PVMT (CPCD) (7") | 1,403 SY | $100 | $140k | 4% |
| 420-7012 CL C CONC (ABUT) | 88.1 CY | $1,350 | $119k | 4% |
| 500-7001 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 341-7001 D-GR HMA TY-B PG64-22 | 344 TON | $250 | $86k | 3% |
| 110-7002 EXCAV (CHANNEL) | 1,420 CY | $51.76 | $73k | 2% |