ADA | SL396 | US 84 to Bagby Ave
Mclennan County · est $3.0M
Mclennan County · est $3.0M
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | TI-ZACK CONCRETE, LLC | $2,695,683.72 | — |
| 2 | 3LW CIVIL LLC | $2,716,165.32 | $20,481.60 |
| 3 | STX CIVIL | $2,793,095.10 | $97,411.38 |
| 4 | TALBERT COMPANIES LLC | $2,837,523.86 | $141,840.14 |
| 5 | CROSS PLUS CONSTRUCTION, LLC | $2,862,894.88 | $167,211.16 |
| 6 | GREY SKY CONSTRUCTION LLC | $3,534,472.00 | $838,788.28 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 531-7001 CONC SIDEWALKS (4") | 7,058 SY | $98.35 | $694k | 26% |
| 530-7007 DRIVEWAYS (CONC) (HES) | 3,448 SY | $110.77 | $382k | 14% |
| 400-7006 CUT & RESTORING PAV | 1,939 SY | $115.5 | $224k | 8% |
| 500-7001 MOBILIZATION | 1 LS | $219,982 | $220k | 8% |
| 529-7009 CONC CURB & GUTTER (TY II) | 2,786 LF | $54.66 | $152k | 6% |
| 132-7003 EMBANK (FNL)(OC)(TY B) | 2,370 CY | $51.17 | $121k | 4% |
| 104-7011 REMOV CONC (DRIVEWAYS) | 3,690 SY | $27.8 | $103k | 4% |
| 162-7002 BLOCK SODDING | 12,748 SY | $5.5 | $70k | 3% |
| 514-7013 PERM CTB (F-SHAPE) (TY 1) | 280 LF | $220 | $62k | 2% |
| 529-7002 CONC CURB (TY II) | 1,010 LF | $54.66 | $55k | 2% |