CR 1170 at Sikes Creek - HBP
Houston County · est $2.5M
Houston County · est $2.5M
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | THK CONSTRUCTION LLC | $2,809,388.46 | — |
| 2 | GARRET SHIELDS INFRASTRUCTURE | $2,983,618.25 | $174,229.79 |
| 3 | SKYLINE BRIDGE LLC | $3,029,411.30 | $220,022.84 |
| 4 | LONGVIEW BRIDGE AND ROAD, LTD. | $3,105,503.50 | $296,115.04 |
| 5 | A. L. HELMCAMP, INC. | $3,320,375.85 | $510,987.39 |
| 6 | HODGES AND SON CONSTRUCTION COMPANY, INC. | $3,422,482.80 | $613,094.34 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 2,246 CY | $160 | $359k | 13% |
| 416-7005 DRILL SHAFT (30 IN) | 930 LF | $268.09 | $249k | 9% |
| 500-7001 MOBILIZATION | 1 LS | $210,000 | $210k | 7% |
| 496-7009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 5 EA | $40,000 | $200k | 7% |
| 247-7056 FL BS (CMP IN PLC)(TY D GR 1-2) (6") | 3,503 SY | $45 | $158k | 6% |
| 425-7026 PRESTR CONC BOX BEAM (4B20) | 496 LF | $310.8 | $154k | 5% |
| 450-7008 RAIL (TY T223) | 786 LF | $175 | $138k | 5% |
| 422-7005 REINF CONC SLAB (BOX BEAM) | 5,626 SF | $24 | $135k | 5% |
| 425-7019 PRESTR CONC SLAB BEAM (5SB15) | 500 LF | $259.05 | $130k | 5% |
| 420-7012 CL C CONC (ABUT) | 130.2 CY | $975 | $127k | 5% |