BU 277A, Near FM 1634 to IH 44
Wichita County · est $5.3M
Wichita County · est $5.3M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | ZACK BURKETT CO. | $5,165,558.03 | — |
| 2 | JAGOE-PUBLIC COMPANY | $5,183,782.65 | $18,224.62 |
| 3 | OVERLAND CORPORATION | $5,720,086.36 | $554,528.33 |
| 4 | A. L. HELMCAMP, INC. | $5,872,487.39 | $706,929.36 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 346-7017 STONE-MTRX-ASPH SMA-F SAC-A PG76-22 | 13,906 TON | $159.4 | $2.22M | 43% |
| 341-7058 D-GR HMA TY-D SAC-B PG76-22 | 5,554 TON | $120.27 | $668k | 13% |
| 351-7005 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 11,000 SY | $51.3 | $564k | 11% |
| 354-7002 PLANE & TEXT ASPH CONC PAV(0" TO 2") | 123,193 SY | $2.92 | $360k | 7% |
| 500-7001 MOBILIZATION | 1 LS | $259,500 | $260k | 5% |
| 341-7059 D-GR HMA TY-D PG76-22 (LEVEL-UP) | 814 TON | $154.53 | $126k | 2% |
| 529-7009 CONC CURB & GUTTER (TY II) | 1,000 LF | $107.1 | $107k | 2% |
| 251-7028 REWORK BS MTL (TY B)(8")(DENS CONT) | 3,150 SY | $32.2 | $101k | 2% |
| 361-7019 FULL - DEPTH REPAIR CPCD (8") | 80 CY | $1,071 | $86k | 2% |
| 341-7001 D-GR HMA TY-B PG64-22 | 655 TON |
| $120.92 |
| $79k |
| 2% |