US 82; US 183 to CR 218
Baylor County · est $6.7M
Baylor County · est $6.7M
5 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | A. L. HELMCAMP, INC. | $5,952,851.12 | — |
| 2 | ZACK BURKETT CO. | $6,034,394.65 | $81,543.53 |
| 3 | DUININCK, INC. | $7,036,802.65 | $1,083,951.53 |
| 4 | RK HALL, LLC | $7,183,118.91 | $1,230,267.79 |
| 5 | OVERLAND CORPORATION | $7,368,789.49 | $1,415,938.37 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 341-7054 D-GR HMA TY-D SAC-B PG70-28 | 42,803 TON | $118 | $5.05M | 85% |
| 351-7004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(5") | 3,527 SY | $58 | $205k | 3% |
| 500-7001 MOBILIZATION | 1 LS | $170,000 | $170k | 3% |
| 341-7082 TACK COAT | 22,934 GAL | $4 | $92k | 2% |
| 134-7002 BACKFILL (TY B) | 842 STA | $100 | $84k | 1% |
| 354-7032 PLANE ASPH CONC PAV(0" TO 2") | 27,237 SY | $2 | $54k | 1% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 MO | $8,700 | $52k | 1% |
| 666-7411 REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 83,536 LF | $0.62 | $52k | 1% |
| 666-7423 REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 82,166 LF | $0.62 | $51k | 1% |
| 533-7001 MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 168,724 LF | $0.17 |
| $29k |
| 0% |