FM 756, SL 323 - Grande Blvd
Smith County · est $2.6M
Smith County · est $2.6M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | DREWERY CONSTRUCTION COMPANY, INCORPORATED | $3,056,756.35 | — |
| 2 | BIG CREEK CONSTRUCTION, LTD. | $3,170,984.95 | $114,228.60 |
| 3 | LONGVIEW BRIDGE AND ROAD, LTD. | $3,345,612.93 | $288,856.58 |
| 4 | TEXAS MATERIALS GROUP, INC. | $4,002,219.27 | $945,462.92 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 346-7009 STONE-MTRX-ASPH SMA-D SAC-A PG76-22 | 9,303 TON | $186.75 | $1.74M | 51% |
| 800-7001 NO. OF WORKING DAYS | 7,500 $/D | $45 | $338k | 10% |
| 500-7001 MOBILIZATION | 1 LS | $295,000 | $295k | 9% |
| 354-7051 PLANE ASPH CONC PAV(2") | 83,821 SY | $3 | $251k | 7% |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 2,000 SY | $80 | $160k | 5% |
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 190 CY | $450 | $86k | 3% |
| 344-7063 SP MIXES SP-D PG76-22 | 323 TON | $225 | $73k | 2% |
| 354-7002 PLANE & TEXT ASPH CONC PAV(0" TO 2") | 16,357 SY | $3 | $49k | 1% |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 66 CY | $625 | $41k | 1% |
| 672-7004 REFL PAV MRKR TY II-A-A | 6,720 EA | $6 | $40k | 1% |