OV | US 77 | FM 3148 | LP 340
Mclennan County · est $9.5M
Mclennan County · est $9.5M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | BIG CREEK CONSTRUCTION, LTD. | $5,957,587.85 | — |
| 2 | TEXAS MATERIALS GROUP, INC. | $6,777,497.35 | $819,909.50 |
| 3 | KNIFE RIVER CORPORATION - SOUTH | $7,289,804.89 | $1,332,217.04 |
| 4 | LONE STAR PAVING COMPANY | $8,080,109.58 | $2,122,521.73 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7021 SP MIXES SP-C SAC-B PG70-22 | 21,504 TON | $90 | $1.94M | 32% |
| 347-7001 TOM-C PG76-22 SAC-A | 10,752 TON | $120 | $1.29M | 22% |
| 439-7025 POLYESTER POLYMER CONC OVERLAY | 251 CY | $4,000 | $1.00M | 17% |
| 354-7052 PLANE ASPH CONC PAV(3") | 191,565 SY | $2.6 | $498k | 8% |
| 530-7010 DRIVEWAYS (ACP) | 6,998 SY | $36 | $252k | 4% |
| 500-7001 MOBILIZATION | 1 LS | $90,000 | $90k | 2% |
| 351-7010 FLEXIBLE PAVEMENT STRUCTURE REPAIR(11") | 882 SY | $100 | $88k | 1% |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 125 CY | $680 | $85k | 1% |
| 438-7007 CLEANING AND SEALING EXIST JOINTS (CL7) | 1,178 LF | $60 | $71k | 1% |
| 479-7001 ADJUSTING MANHOLES | 31 EA | $2,200 | $68k | 1% |