FM 3039: S of Hunter Ln to S of W Lewis
Kaufman County · est $727k
Kaufman County · est $727k
9 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | C & W SOUTHERN LLC | $598,150.10 | — |
| 2 | ICOS MANAGEMENT, LLC | $640,294.25 | $42,144.15 |
| 3 | TUCAN CONTRACTING, LLC | $685,106.19 | $86,956.09 |
| 4 | THK CONSTRUCTION LLC | $698,125.47 | $99,975.37 |
| 5 | HIGHWAY 19 CONSTRUCTION LLC | $754,504.10 | $156,354.00 |
| 6 | FOUTSCO PAVING COMPANY, LLC | $789,378.15 | $191,228.05 |
| 7 | CENTRAL NORTH CONSTRUCTION, LLC | $852,159.50 | $254,009.40 |
| 8 | CROSS PLUS CONSTRUCTION, LLC | $944,534.00 | $346,383.90 |
| 9 | ED BELL CONSTRUCTION COMPANY | $1,176,330.30 | $578,180.20 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 432-7041 RIPRAP (STONE PROTECTION)(12 IN) | 398 CY | $165 | $66k | 11% |
| 500-7001 MOBILIZATION | 1 LS | $65,000 | $65k | 11% |
| 466-7210 WINGWALL (SW - 0) (HW=12 FT) | 1 EA | $45,000 | $45k | 8% |
| 462-7093 CONC BOX CULV (10 FT X 10 FT)(EXTEND) | 20 LF | $2,000 | $40k | 7% |
| 531-7001 CONC SIDEWALKS (4") | 324 SY | $100 | $32k | 5% |
| 531-7026 CONCRETE SIDEWALK (RETAINING WALL) | 47 CY | $650 | $31k | 5% |
| 450-7032 RAIL (TY C221) | 103 LF | $250 | $26k | 4% |
| 161-7002 COMPOST MANUF TOPSOIL (4") | 1,836 SY | $12 | $22k | 4% |
| 505-7001 TMA (STATIONARY) | 79 DAY | $275 | $22k | 4% |
| 6073-7008 SOLAR-POWERED RRFB (ONE-WAY WIRELESS) | 2 EA | $10,000 | $20k | 3% |