FM 855, US 69-US 175, Sfty
Cherokee County · est $5.5M
Cherokee County · est $5.5M
13 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | 3LW CIVIL LLC | $4,101,438.93 | — |
| 2 | SKYLINE BRIDGE LLC | $4,685,132.10 | $583,693.17 |
| 3 | THK CONSTRUCTION LLC | $4,790,165.93 | $688,727.00 |
| 4 | L. S. EQUIPMENT CO., INC. | $4,986,544.14 | $885,105.21 |
| 5 | BAKER & COMPANY CONSTRUCTION, LLC | $5,077,561.05 | $976,122.12 |
| 6 | HIGHWAY 19 CONSTRUCTION LLC | $5,229,428.30 | $1,127,989.37 |
| 7 | TRUE ROADS CONSTRUCTION LLC | $5,455,084.00 | $1,353,645.07 |
| 8 | LONGVIEW BRIDGE AND ROAD, LTD. | $5,591,436.74 | $1,489,997.81 |
| 9 | GARRET SHIELDS INFRASTRUCTURE | $5,689,734.30 | $1,588,295.37 |
| 10 | EAST TEXAS BRIDGE, INC. | $5,765,448.59 | $1,664,009.66 |
| 11 | LAKEY, INC. | $6,549,548.30 | $2,448,109.37 |
| 12 | ALTUS CONSTRUCTION LLC | $7,187,198.57 | $3,085,759.64 |
| 13 | REYNOLDS & KAY, LTD. | $8,377,420.31 | $4,275,981.38 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 132-7017 EMBANK (VEH)(OC)(TY C) | 11,869 CY | $38.33 | $455k | 11% |
| 466-7192 WINGWALL (PW - 2) (HW=8 FT) | 12 EA | $37,276 | $447k | 11% |
| 500-7001 MOBILIZATION | 1 LS | $363,250 | $363k | 9% |
| 403-7001 TEMPORARY SPL SHORING | 8,532 SF | $27.5 | $235k | 6% |
| 160-7002 FURN & PLACE TOPSOIL (4") | 47,686 SY | $4.25 | $203k | 5% |
| 530-7010 DRIVEWAYS (ACP) | 2,623 SY | $55 | $144k | 4% |
| 467-7308 SET (TY II) (18 IN) (RCP) (6: 1) (P) | 128 EA | $1,093 | $140k | 3% |
| 464-7003 RC PIPE (CL III)(18 IN) | 1,921 LF | $63.56 | $122k | 3% |
| 420-7061 CL C CONC (COLLAR) | 79 EA | $1,250 | $99k | 2% |
| 462-7069 CONC BOX CULV (6 FT X 6 FT)(EXTEND) | 92 LF | $1,061 | $98k | 2% |