GTAO - FY 25 Small Sign Upgrades
Travis County · est $728k
Travis County · est $728k
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | RHINO EQUITY, LLC | $504,526.50 | — |
| 2 | CENTERLINE TECHNOLOGIES, LLC | $570,757.50 | $66,231.00 |
| 3 | GARRET SHIELDS INFRASTRUCTURE | $589,290.00 | $84,763.50 |
| 4 | T&L CLEANING SERVICES LLC | $635,236.25 | $130,709.75 |
| 5 | TRP INFRASTRUCTURE SERVICES, LLC | $661,873.75 | $157,347.25 |
| 6 | HAZMAT INTERNATIONAL, INC. | $665,430.00 | $160,903.50 |
| 7 | E.V.G. ENTERPRISE | $859,820.00 | $355,293.50 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 644-7001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 429 EA | $547 | $235k | 47% |
| 644-7004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 175 EA | $550 | $96k | 19% |
| 644-7065 RELOCATE SM RD SN SUP&AM TY 10BWG | 133 EA | $418 | $56k | 11% |
| 505-7003 TMA (MOBILE OPERATION) | 60 DAY | $750 | $45k | 9% |
| 644-7073 REMOVE SM RD SN SUP&AM | 564 EA | $65 | $37k | 7% |
| 500-7001 MOBILIZATION | 1 LS | $10,000 | $10k | 2% |
| 644-7028 IN SM RD SN SUP&AM TYS80(1)SA(T) | 14 EA | $665 | $9k | 2% |
| 644-7067 RELOCATE SM RD SN SUP&AM TY S80 | 13 EA | $540 | $7k | 1% |
| 644-7009 IN SM RD SN SUP&AM TY10BWG(1)SB(P) | 7 EA | $500 | $4k | 1% |
| 644-7012 IN SM RD SN SUP&AM TY10BWG(1)SB(T) | 4 EA | $570 | $2k | 0% |