SL 368: 0016-08-049; OV
Bexar County · est $4.8M
Bexar County · est $4.8M
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | CLARK CONSTRUCTION OF TEXAS, INC. | $3,947,711.24 | — |
| 2 | TEXAS MATERIALS GROUP, INC. | $4,889,950.63 | $942,239.39 |
| 3 | LONE STAR PAVING COMPANY | $4,957,514.77 | $1,009,803.53 |
| 4 | ALLEN KELLER COMPANY | $5,210,369.72 | $1,262,658.48 |
| 5 | HUNTER INDUSTRIES, LTD. | $5,350,448.01 | $1,402,736.77 |
| 6 | DEAN WORD COMPANY, LTD. | $5,691,168.21 | $1,743,456.97 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7082 SP MIXES SP-C SAC-B HPG | 13,866 TON | $117.87 | $1.63M | 41% |
| 351-7003 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") | 38,047 SY | $25.55 | $972k | 25% |
| 351-7005 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 14,256 SY | $39.5 | $563k | 14% |
| 354-7051 PLANE ASPH CONC PAV(2") | 120,572 SY | $1.25 | $151k | 4% |
| 341-7059 D-GR HMA TY-D PG76-22 (LEVEL-UP) | 1,290 TON | $69.76 | $90k | 2% |
| 644-7001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 67 EA | $720 | $48k | 1% |
| 500-7001 MOBILIZATION | 1 LS | $34,311 | $34k | 1% |
| 351-7015 FLEXIBLE PAVEMENT STRUCTURE REPAIR(16") | 437 SY | $73.19 | $32k | 1% |
| 666-7411 REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 30,399 LF | $0.85 | $26k | 1% |
| 160-7002 FURN & PLACE TOPSOIL (4") |
| 3,403 SY |
| $7.5 |
| $26k |
| 1% |