US 281:0253-03-078; OV
Comal County · est $9.2M
Comal County · est $9.2M
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | TEXAS MATERIALS GROUP, INC. | $5,825,980.66 | — |
| 2 | LONE STAR PAVING COMPANY | $6,264,913.41 | $438,932.75 |
| 3 | HUNTER INDUSTRIES, LTD. | $6,384,795.25 | $558,814.59 |
| 4 | CLARK CONSTRUCTION OF TEXAS, INC. | $6,418,431.05 | $592,450.39 |
| 5 | ALLEN KELLER COMPANY | $6,682,243.59 | $856,262.93 |
| 6 | DEAN WORD COMPANY, LTD. | $7,144,011.85 | $1,318,031.19 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7030 SP MIXES SP-C SAC-A PG76-22 | 34,869 TON | $98 | $3.42M | 59% |
| 351-7005 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 15,730 SY | $33.6 | $529k | 9% |
| 354-7051 PLANE ASPH CONC PAV(2") | 303,222 SY | $1.35 | $409k | 7% |
| 451-7020 RETROFIT RAIL (TY T631) | 1,198 LF | $125 | $150k | 3% |
| 644-7004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 159 EA | $775 | $123k | 2% |
| 500-7001 MOBILIZATION | 1 LS | $120,000 | $120k | 2% |
| 752-7002 SPOT TREE TRIMMING / BRUSH REMOVAL | 23,768 LF | $4.5 | $107k | 2% |
| 341-7046 D-GR HMA TY-D PG64-22 (LEVEL-UP) | 887 TON | $99 | $88k | 2% |
| 429-7005 CONC STR REPAIR(DECK REP (FULL DEPTH)) | 600 SF | $125 | $75k | 1% |
| 454-7009 HEADER TYPE EXPANSION JOINT | 100 CF | $625 |
| $63k |
| 1% |