RM 150 - SE of Darden Hill to RM 1826
Hays County · est $3.1M
Hays County · est $3.1M
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | STX CIVIL | $3,441,589.85 | — |
| 2 | HUNTER INDUSTRIES, LTD. | $3,447,342.11 | $5,752.26 |
| 3 | D&S CONCRETE CONTRACTORS LLC | $3,562,474.46 | $120,884.61 |
| 4 | TEXAS MATERIALS GROUP, INC. | $3,760,933.86 | $319,344.01 |
| 5 | D & D CONTRACTORS, INC. | $3,911,325.08 | $469,735.23 |
| 6 | AARON CONCRETE CONTRACTORS, LLC | $4,407,409.74 | $965,819.89 |
| 7 | JOE BLAND CONSTRUCTION LLC | $4,595,040.00 | $1,153,450.15 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 347-7002 TOM-C PG76-22 SAC-B | 2,096 TON | $188.26 | $395k | 11% |
| 341-7001 D-GR HMA TY-B PG64-22 | 2,590 TON | $126.8 | $328k | 10% |
| 247-7179 FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS) | 3,679 CY | $80.09 | $295k | 9% |
| 500-7001 MOBILIZATION | 1 LS | $176,324 | $176k | 5% |
| 341-7056 D-GR HMA TY-D PG76-22 | 1,317 TON | $128.62 | $169k | 5% |
| 508-7001 CONSTRUCTING DETOURS | 2,045 SY | $67.25 | $138k | 4% |
| 462-7011 CONC BOX CULV (6 FT X 3 FT) | 162 LF | $735.88 | $119k | 3% |
| 160-7002 FURN & PLACE TOPSOIL (4") | 28,174 SY | $3.74 | $105k | 3% |
| 464-7042 RC PIPE (ARCH)(CL III)(DES 3) | 380 LF | $269.05 | $102k | 3% |
| 530-7006 DRIVEWAYS (CONC) | 765 SY | $130.51 | $100k | 3% |