US 60/Fillmore St BRG FY 26 Bmip
Potter County · est $17M
Potter County · est $17M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | RAGLE CONSTRUCTION, INC. | $17,113,098.10 | — |
| 2 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | $17,843,434.40 | $730,336.30 |
| 3 | GILVIN-TERRILL, LTD. | $18,559,789.35 | $1,446,691.25 |
| 4 | GIBSON & ASSOCIATES, INC. | $18,667,033.32 | $1,553,935.22 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 496-7013 REMOV STR (BRIDGE SLAB) | 1 EA | $2,650,000 | $2.65M | 15% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 39 MO | $50,000 | $1.95M | 11% |
| 500-7001 MOBILIZATION | 1 LS | $1,690,000 | $1.69M | 10% |
| 483-7006 HYDRO-DEMOLITION (1/2 IN) | 11,018 SY | $105 | $1.16M | 7% |
| 439-7023 CL CO CONC OVRLY(STL FBR REIN)(3 IN) | 6,983 SY | $130 | $908k | 5% |
| 344-7056 SP MIXES SP-D PG70-28 | 3,367 TON | $225 | $758k | 4% |
| 422-7001 REINF CONC SLAB | 50,676 SF | $12.25 | $621k | 4% |
| 785-7011 BRIDGE JOINT REPLACEMENT (SEJ) | 953 LF | $465 | $443k | 3% |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 4,287 SF | $95 | $407k | 2% |
| 439-7022 CL CO CONC OVRLY(STL FBR REIN)(2.5 IN) | 2,605 SY | $125 |
| $326k |
| 2% |