FM 1130-(FM 1136 E-4.24 MI)Paved SHLDRS
Orange County · est $5.0M
Orange County · est $5.0M
5 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | TEXAS MATERIALS GROUP, INC. | $3,916,261.96 | — |
| 2 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | $4,226,289.67 | $310,027.71 |
| 3 | MB WESTERN INDUSTRIAL CONTRACTING CO. | $4,791,330.96 | $875,069.00 |
| 4 | RAGLE CONSTRUCTION, INC. | $4,987,005.48 | $1,070,743.52 |
| 5 | GREY SKY CONSTRUCTION LLC | $6,010,294.50 | $2,094,032.54 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 341-7003 D-GR HMA TY-B PG64-22 (EXEMPT) | 11,892 TON | $134 | $1.59M | 41% |
| 100-7002 PREPARING ROW | 147 STA | $1,709 | $251k | 6% |
| 500-7001 MOBILIZATION | 1 LS | $225,000 | $225k | 6% |
| 432-7002 RIPRAP (CONC)(5 IN) | 200 CY | $980 | $196k | 5% |
| 316-7245 AGGR (TY-PB OR PL, GR-4)(SAC-B) | 537 CY | $224 | $120k | 3% |
| 466-7177 WINGWALL (PW - 1) (HW=7 FT) | 4 EA | $28,600 | $114k | 3% |
| 316-7007 ASPH (AC-20-5TR) | 25,133 GAL | $4.5 | $113k | 3% |
| 530-7015 DRIVEWAYS (BASE) | 2,419 SY | $44.75 | $108k | 3% |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 144 CY | $675 | $97k | 2% |
| 112-7001 SUBGR WIDEN (OC) | 225 STA | $371 | $83k | 2% |