Ada_Remediation
Ector County · est $1.5M
Ector County · est $1.5M
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | PATHFIELD INVESTMENTS LLC | $1,271,684.30 | — |
| 2 | DELGADO'S CONTRACTORS, LLC | $1,288,450.00 | $16,765.70 |
| 3 | STX CIVIL | $1,375,026.50 | $103,342.20 |
| 4 | TI-ZACK CONCRETE, LLC | $1,495,468.96 | $223,784.66 |
| 5 | O. TREVINO CONSTRUCTION, LLC | $1,947,807.00 | $676,122.70 |
| 6 | GREY SKY CONSTRUCTION LLC | $1,994,523.00 | $722,838.70 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 531-7001 CONC SIDEWALKS (4") | 3,434 SY | $80 | $275k | 22% |
| 530-7006 DRIVEWAYS (CONC) | 2,069 SY | $125 | $259k | 20% |
| 531-7003 CONC SIDEWALKS (6") | 1,627 SY | $150 | $244k | 19% |
| 500-7001 MOBILIZATION | 1 LS | $110,000 | $110k | 9% |
| 531-7006 CURB RAMPS (TY 2) | 16 EA | $3,700 | $59k | 5% |
| 104-7011 REMOV CONC (DRIVEWAYS) | 2,201 SY | $20 | $44k | 3% |
| 531-7005 CURB RAMPS (TY 1) | 15 EA | $2,900 | $44k | 3% |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 4 EA | $10,000 | $40k | 3% |
| 529-7009 CONC CURB & GUTTER (TY II) | 716 LF | $55 | $39k | 3% |
| 644-7065 RELOCATE SM RD SN SUP&AM TY 10BWG | 37 EA | $650 | $24k | 2% |