0907-00-236 ADA Remediation
Tom Green County · est $2.1M
Tom Green County · est $2.1M
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | TI-ZACK CONCRETE, LLC | $1,672,395.44 | — |
| 2 | DELGADO'S CONTRACTORS, LLC | $1,927,500.00 | $255,104.56 |
| 3 | TUCAN CONTRACTING, LLC | $1,967,078.05 | $294,682.61 |
| 4 | STX CIVIL | $1,974,988.76 | $302,593.32 |
| 5 | 3LW CIVIL LLC | $1,977,584.19 | $305,188.75 |
| 6 | REECE ALBERT, INC. | $2,424,103.41 | $751,707.97 |
| 7 | O. TREVINO CONSTRUCTION, LLC | $3,401,301.50 | $1,728,906.06 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 531-7001 CONC SIDEWALKS (4") | 4,841 SY | $95.34 | $462k | 28% |
| 530-7006 DRIVEWAYS (CONC) | 3,577 SY | $114.42 | $409k | 24% |
| 400-7008 CUT & RESTORE ASPH PAVING | 1,489 SY | $56.6 | $84k | 5% |
| 529-7009 CONC CURB & GUTTER (TY II) | 1,629 LF | $48.29 | $79k | 5% |
| 500-7001 MOBILIZATION | 1 LS | $74,494 | $74k | 4% |
| 104-7011 REMOV CONC (DRIVEWAYS) | 2,837 SY | $24.28 | $69k | 4% |
| 432-7001 RIPRAP (CONC)(4 IN) | 79 CY | $855.75 | $68k | 4% |
| 529-7002 CONC CURB (TY II) | 969 LF | $48.29 | $47k | 3% |
| 531-7020 CURB RAMPS (TY 7) | 240 SY | $143.82 | $35k | 2% |
| 105-7129 REMOVING STAB BASE AND ASPH PAV(0"-16") | 1,223 SY | $28.16 | $34k | 2% |