FY25 Signal Maintenance Tarrant
Tarrant County · est $2.0M
Tarrant County · est $2.0M
1 published bidder
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | WG ENGINEERING & CONSTRUCTION, LLC | $2,385,405.00 | — |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Bid tab · TxDOT
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 500-7002 MOBILIZATION (CALLOUT) | 20 EA | $10,150 | $203k | 9% |
| 690-7020 INSTALL OF ELECTRICAL SERVICE | 12 EA | $11,000 | $132k | 6% |
| 690-7049 REPLACE OF RDSD FLSH BEACON ASSM | 20 EA | $5,500 | $110k | 5% |
| 690-7050 INSTALL OF RDSD FLSH BEACON ASSM | 20 EA | $5,500 | $110k | 5% |
| 690-7039 REPLACE OF CONTROL CABINET(GRND MNT) | 10 EA | $8,000 | $80k | 3% |
| 690-7040 INSTALL OF CONTROL CABINET(GRND MNT) | 10 EA | $8,000 | $80k | 3% |
| 690-7051 REMOVAL OF SIGNAL POLE ASSM | 40 EA | $2,000 | $80k | 3% |
| 690-7052 REPLACE OF SIGNAL POLE ASSM | 20 EA | $4,000 | $80k | 3% |
| 690-7053 INSTALL OF SIGNAL POLE ASSM | 20 EA | $4,000 | $80k | 3% |
| 624-7008 GROUND BOX TY D (162922)W/APRON | 40 EA | $1,900 | $76k | 3% |