CR 2018 @Hackberry Branch Brg Replace
Newton County · est $1.8M
Newton County · est $1.8M
8 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | HODGES AND SON CONSTRUCTION COMPANY, INC. | $1,485,795.74 | — |
| 2 | R CONSTRUCTION CIVIL, LLC | $1,744,494.60 | $258,698.86 |
| 3 | TEXAS STEEL INDUSTRIAL PLACING, LLC | $1,775,911.20 | $290,115.46 |
| 4 | ELITE CONTRACTORS AND EQUIPMENT LTD | $1,870,205.90 | $384,410.16 |
| 5 | SKYLINE BRIDGE LLC | $1,872,637.68 | $386,841.94 |
| 6 | GARRET SHIELDS INFRASTRUCTURE | $2,092,459.00 | $606,663.26 |
| 7 | BLACKSMITH VENTURES LLC | $2,220,060.12 | $734,264.38 |
| 8 | ISI CONTRACTING, INC. | $2,733,805.77 | $1,248,010.03 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 409-7001 PRESTR CONC PIL (16 IN SQ) | 1,296 LF | $145 | $188k | 13% |
| 247-7090 FL BS (CMP IN PLC)(TY A GR 1-2) (10") | 2,878 SY | $45 | $130k | 9% |
| 500-7001 MOBILIZATION | 1 LS | $125,000 | $125k | 8% |
| 425-7001 PRESTR CONC GIRDER (TX28) | 476 LF | $260 | $124k | 8% |
| 420-7012 CL C CONC (ABUT) | 96.4 CY | $1,200 | $116k | 8% |
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 595 CY | $190 | $113k | 8% |
| 422-7001 REINF CONC SLAB | 3,120 SF | $30 | $94k | 6% |
| 425-7019 PRESTR CONC SLAB BEAM (5SB15) | 247.5 LF | $305 | $75k | 5% |
| 432-7055 RIPRAP (CONC)(CL B)(RR8&RR9) | 100 CY | $585 | $59k | 4% |
| 400-7010 CEM STABIL BKFL | 259.3 CY | $200 | $52k | 3% |