IH 30 Truck Parking
Bowie County · est $12M
Bowie County · est $12M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | EAST TEXAS BRIDGE, INC. | $10,625,436.47 | — |
| 2 | LONGVIEW BRIDGE AND ROAD, LTD. | $10,965,650.81 | $340,214.34 |
| 3 | DRAKE COMPANIES LLC | $11,520,690.13 | $895,253.66 |
| 4 | HIGHWAY 19 CONSTRUCTION LLC | $13,658,247.40 | $3,032,810.93 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7029 SP MIXES SP-C PG76-22 | 15,759 TON | $132 | $2.08M | 20% |
| 512-7081 PTB (FUR&INST)(SGL SLP)(TY 1) OR (STL) | 15,630 LF | $65 | $1.02M | 10% |
| 132-7018 EMBANK (VEH)(DC)(TY C) | 70,340 CY | $11.5 | $809k | 8% |
| 260-7001 LIME (COM OR QK)(SLURRY) OR QK(DRY) | 1,665 TON | $380 | $633k | 6% |
| 4021-7001 PERMEABLE CONCRETE EDGE DRAIN | 9,183 LF | $60 | $551k | 5% |
| 500-7001 MOBILIZATION | 1 LS | $500,000 | $500k | 5% |
| 344-7064 SP MIXES SP-D SAC-A PG76-22 | 3,110 TON | $133 | $414k | 4% |
| 613-7005 HI MST IL POLE (150 FT)( 80 MPH) | 8 EA | $50,800 | $406k | 4% |
| 275-7001 CEMENT | 1,665 TON | $240 | $400k | 4% |
| 100-7001 PREPARING ROW | 46.1 AC | $7,700 | $355k | 3% |