SH 16 - AT Oatman Crk - 25BMIP
Llano County · est $1.9M
Llano County · est $1.9M
10 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | STRUCTURAL INTEGRITY GROUP LLC | $2,089,129.10 | — |
| 2 | 3LW CIVIL LLC | $2,263,825.95 | $174,696.85 |
| 3 | GARRET SHIELDS INFRASTRUCTURE | $2,378,681.20 | $289,552.10 |
| 4 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | $2,421,432.00 | $332,302.90 |
| 5 | MPB, INC. | $2,485,991.64 | $396,862.54 |
| 6 | RELMCO, INC. | $2,579,443.52 | $490,314.42 |
| 7 | MB WESTERN INDUSTRIAL CONTRACTING CO. | $2,698,665.58 | $609,536.48 |
| 8 | CEKRA INC. | $2,858,565.66 | $769,436.56 |
| 9 | RESTEK, INC. | $2,906,996.89 | $817,867.79 |
| 10 | GREY SKY CONSTRUCTION LLC | $3,196,494.50 | $1,107,365.40 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 439-7017 POLYESTER POLYMER CONC OVERLAY (2") | 1,612 SY | $290 | $467k | 22% |
| 500-7001 MOBILIZATION | 1 LS | $190,000 | $190k | 9% |
| 446-7007 CLEAN & PAINT EXIST PILING (SYSTEM I) | 1 LS | $135,000 | $135k | 6% |
| 446-7002 CLEAN & PAINT EXIST STR (SYSTEM II) | 1 LS | $105,800 | $106k | 5% |
| 420-7060 CL C CONC (PILE ENCASEMENT) | 101 CY | $925 | $93k | 4% |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 108.65 CY | $650 | $71k | 3% |
| 451-7020 RETROFIT RAIL (TY T631) | 590 LF | $110 | $65k | 3% |
| 451-7004 RETROFIT RAIL (TY T221) | 180 LF | $325 | $59k | 3% |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 16 EA | $3,500 | $56k | 3% |
| 540-7001 MTL W-BEAM GD FEN (TIM POST) | 1,701 LF | $30 | $51k |
| 2% |