FM 123 from US 79 to FM 31S
Panola County · est $2.0M
Panola County · est $2.0M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | MADDEN CONTRACTING COMPANY, LLC. | $2,441,151.06 | — |
| 2 | THK CONSTRUCTION LLC | $2,452,219.03 | $11,067.97 |
| 3 | L. S. EQUIPMENT CO., INC. | $2,695,990.19 | $254,839.13 |
| 4 | EAST TEXAS BRIDGE, INC. | $2,704,457.33 | $263,306.27 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7030 SP MIXES SP-C SAC-A PG76-22 | 5,548 TON | $160 | $888k | 36% |
| 247-7090 FL BS (CMP IN PLC)(TY A GR 1-2) (10") | 8,543 SY | $37.04 | $316k | 13% |
| 100-7002 PREPARING ROW | 106.5 STA | $2,470 | $263k | 11% |
| 500-7001 MOBILIZATION | 1 LS | $160,000 | $160k | 7% |
| 432-7005 RIPRAP (CONC)(CL B) | 125 CY | $860 | $108k | 4% |
| 354-7032 PLANE ASPH CONC PAV(0" TO 2") | 9,403 SY | $10 | $94k | 4% |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 86 CY | $855 | $74k | 3% |
| 316-7007 ASPH (AC-20-5TR) | 7,473 GAL | $7.25 | $54k | 2% |
| 540-7001 MTL W-BEAM GD FEN (TIM POST) | 1,950 LF | $23.5 | $46k | 2% |
| 134-7002 BACKFILL (TY B) | 153.18 STA | $202 | $31k | 1% |