BS 6-R F:N of SH 21. T:FM 158 - Interim
Brazos County · est $4.9M
Brazos County · est $4.9M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | LARRY YOUNG PAVING, INC. | $4,454,972.58 | — |
| 2 | BRAZOS PAVING, INC. | $4,800,359.20 | $345,386.62 |
| 3 | TI-ZACK CONCRETE, LLC | $5,287,972.96 | $833,000.38 |
| 4 | KNIFE RIVER CORPORATION - SOUTH | $5,391,744.32 | $936,771.74 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 619-7006 ITS MULTI-DUCT CND (PVC-80)(BORE) | 21,215 LF | $22 | $467k | 10% |
| 500-7001 MOBILIZATION | 1 LS | $388,000 | $388k | 9% |
| 344-7030 SP MIXES SP-C SAC-A PG76-22 | 1,164 TON | $200 | $233k | 5% |
| 680-7002 INSTALL HWY TRF SIG (ISOLATED) | 3 EA | $70,000 | $210k | 5% |
| 619-7005 ITS MULTI-DUCT CND (PVC-80) | 5,190 LF | $39 | $202k | 5% |
| 531-7003 CONC SIDEWALKS (6") | 1,488 SY | $110 | $164k | 4% |
| 192-7046 PLANT MATERIAL (3 GAL) (SHRUB) | 3,150 EA | $50 | $158k | 4% |
| 6027-7014 FIBER OPTIC CBL (SNGL-MODE)(72 FIBER) | 52,810 LF | $2.5 | $132k | 3% |
| 344-7001 SP MIXES SP-B PG64-22 | 502 TON | $260 | $131k | 3% |
| 686-7055 INS TRF SIG PL AM(S)1 ARM(50')LUM | 3 EA | $42,000 | $126k |
| 3% |